Community Maintenance

Wetland assessment with Jeff Ravage, Coalition for the Upper South Platte, and Ted Stein, ECHPOA representative.  Pictures submitted by Tim Bradley, May 6, 2017.

    

A water flow meter was installed by Tim Bradley and Paul Ellis as per new state requirements.  Submitted by Paul Ellis, April 1, 2017.

     

     

New tile and baseboards were installed in the hallway and both bathrooms.  New carpet was installed in the great room.  Submitted by Karen Ellis, November 14, 2015.

New Tile 11142015a     New Tile 11142015b

New Tile 11142015c     New Carpet 11142015a

New Carpet 11142015b     New Carpet 11142015c

New Carpet 11142015d

Building improvements – DURING.  Submitted by Bryan Murphy, November 2, 2015.

Hallway 11-2-2015a     Hallway 11-2-2015b

Bathroom 11-2-2015a     Bathroom 11-2-2015b

Bathroom 11-2-2015d     Bathroom 11-2-2015c

Baseboards 11-2-2015    base boards

Building improvements – DURING.  Submitted by Karen Ellis, November 1, 2015.

Tile and cement board 11-1-2015     Moved furniture 11-1-2015

Building improvements – BEFORE.  Submitted by Karen Ellis, August 7, 2015.

Bathroom 8-7-2015b     Bathroom 8-7-2015a

Hallway entrance 8-7-2015     Meeting room entrance 8-7-2015

Meeting room 8-7-2-15b

Bulleting board refreshed by Dale Wark.  Submitted by Karen Ellis, November 1, 2015.

Bulletin Board 11-01-2015

More fascia boards replaced by Paul Ellis and Walt Wark.  Submitted by Karen Ellis, November 1, 2015.

Fascia 11-01-2015b     Fascia 11-01-2015a

Rotted deck boards replaced by Mike Felix, Paul Ellis, Stan Willman, and Walt Wark.  Walt Wark cut up, loaded up, and removed all the old boards.  I wish I would have gotten a picture of the huge pile of old boards, but there is only a picture of cleaned up area.  Submitted by Karen Ellis, October 10, 2015.

deck boards 10-11-2015a     scrap lumber 10-11-2015a

scrap lumber 10-11-2015b

Fascia boards were painted by Paul Ellis and Walt Wark.  Old boards removed and replaced by Paul Ellis.  Submitted by Karen Ellis, October 4, 2015.

Fascia 10-04-2015a     Fascia 10-04-2015b

Fascia 10-04-2015c

Front steps replaced by Felix Beall, cleanup by Walt Wark, submitted by Karen Ellis, August 9, 2015

Front Steps - August 2015b                        Front Steps - August 2015c

Front Steps - August 2015a     Front Steps - August 2015e

Before                                                                          After

Association Building 12-07-2014     Front Steps - August 2015d

Seasonal change by Joyce Deming & Vic Hahn, submitted by Karen Ellis, Dec. 7, 2014

Seasonal Flowers 12-07-2014

Roof Replacement by Felix Beall, submitted by Karen Ellis, December 7, 2014

Roof Replaced 12-07-2014

Award Ceremony for Ken and Betty Perdew, submitted by Karen Ellis, December 3, 2014

Ken Perdew Award 1   Ken Perdew Award 2

Ken Perdew Award 4                       Ken Perdew Award 3

Restored by Vic Hahn and Joyce Deming, submitted by Joyce Deming, June 3, 2014

Vicgivingthepostholediggeraworkout     Joycesupervisingthepostholediggingoperation

Vicattachesthefreshlypaintedletters     Looksprettyleveltome

Puttingonthefinishingtouches     Joycedoingwhatshedoesbest-posingwithtools

Restored by Vic Hahn and Joyce Deming, submitted by Ken Perdew, June 1, 2014

Restored ECHPOA sign 06-01-2014b     Restored ECHPOA sign 06-01-2014a

Submitted by Ken Perdew, March 12, 2012

  

Advertisements

2 Responses to Community Maintenance

  1. Jane Johnson says:

    Does this mean the power was out thru the entire Highlands?

    544 Elk Creek
    Jane Johnson

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s